1 / 5
| Raw Material | PETG (K2012) SK Chemical | ![]() ![]() |
| Using Machine | LDHW-1200*1000 | ![]() |
| Initial moisture | 550ppm (Tested by German Sartorius) | ![]() |
| Drying Temperature | 105℃ | |
| Drying time | 20 mins | |
| Final moisture | 20ppm (Tested by German Sartorius) | ![]() |
| Final product | Dried PETG (no clumping, no pellets sticking) | ![]() |

Step 1: Heating
The material is heated to a preset temperature using infrared lamps with low drum rotation speed to ensure rapid temperature elevation.
Step 2: Drying
Once the target temperature is reached, the drum rotation speed increases to prevent clumping. Infrared lamp power is adjusted for optimal drying. Process typically completes in 15-20 minutes.
Step 3: Discharge & Refill
The IR Drum automatically discharges the material and refills for the next cycle. Parameters are managed via a touch screen control system and can be saved as recipes.


Our facility features a fully equipped test center to conduct continuous or discontinuous experiments on your material samples, utilizing advanced automation and measurement technology.
